E-Houses at NR Electric's Changzhou base: the test cell with a large roll-up door and the control room beside it

‎125 kA High-Power Test Lab E-⁠Houses for NR Electric

NR Electric 125 kA AC/DC High-Power Breaking Test SystemChina & East Asia
Changzhou China
Five E-⁠Houses
Largest building
‎15.4 × 11 × 6.3 m
October 2026
Commissioning done

Scroll down to learn more

Project Overview

Power & GridOct 2026China & East Asia

ETENZ manufactured five high-power test lab E-⁠Houses for NR Electric's 125 kA AC/DC high-power breaking test system at NR Electric's production base in Changzhou, China: the current source, voltage source, power supply, control room and test cell buildings. The current source, voltage source and test cell buildings are clear-span, with no internal columns; the largest, the current source building, measures 15.4 × 11 × 6.3 m, and the test cell stands 7 m high. ETENZ fabricated each building in sections and joined the sections into complete buildings on site by three-dimensional modular assembly, then fitted out the HVAC, auxiliary power distribution and lighting inside. The E-⁠Houses were delivered in October 2026. On-site commissioning is complete, and the test system is awaiting entry into service.

A large test lab E-House: low-pitched roof, round wall penetrations and open end doors with panels inside

Service Scope

Five Test Lab E-⁠Houses: Manufacturing, Site Assembly and Auxiliary Systems

ETENZ carried out the structural design and manufacture of all five buildings, assembled them on site by three-dimensional modular assembly and fixed them on their foundations, and fitted out the auxiliary systems inside: HVAC, auxiliary power distribution and lighting (including emergency lighting), the earthing system and the cabling. The control room also has anti-static flooring, a 3 × 1.5 m double-glazed observation window in the wall that faces the test cell, and pre-drilled mounting positions for eight panels and a 12-⁠workstation operator console. NR Electric supplied the power sources, circuit equipment and panels of the test system.

End of a test lab E-House: sealed double doors, an industrial air conditioner on the wall and an outdoor AC unit

Engineering & Integration

One Building for Each Test Circuit

The current source, voltage source, power supply, control room and test cell each have their own building, from the 11 × 4 × 3.2 m power supply building to the 15.4 × 11 × 6.3 m current source building, and each is sized to the layout and maintenance aisles of the equipment it houses.

Three-Dimensional Modular Assembly, Clear-Span Interiors

Each building was fabricated in sections and joined on site by three-dimensional modular assembly; the largest, the current source building, measures 15.4 × 11 × 6.3 m once assembled. The current source, voltage source and test cell buildings have no internal columns, so the equipment layout and maintenance aisles are not tied to a column grid.

A 7 m Test Cell With a Large Roll-Up Door

The 10 × 10 × 7 m test cell has a large roll-up door in its front wall, so test objects can be moved in and out in one piece.

Control Room Directly Beside the Test Cell

The control room stands against the test cell, with a 3 × 1.5 m double-glazed observation window in the facing wall and drainage and waterproofing along that side. Inside, the lighting runs on separate normal and emergency circuits, and a primary and a secondary earthing grid run under the floor.

Front of the 7 m test cell with a large roll-up door, and the control room built against its side

Delivery Outcome

The five E-⁠Houses were delivered in October 2026, joined and set in place on site, with the HVAC and auxiliary power distribution fitted out. On-site commissioning is complete, and the test system is awaiting entry into service.

5
E-⁠Houses
Current source, voltage source, power supply, control room and test cell buildings, one of each
15.4 m
Largest building
Current source building, 15.4 × 11 × 6.3 m, three-dimensional modular assembly, clear span with no internal columns
125 kA
Test system served
NR Electric's AC/DC high-power breaking test system

Project Value

Each test circuit has its own building sized to its equipment, the large buildings are clear-span, and all five were assembled on site from factory-built sections, the largest to 15.4 × 11 × 6.3 m. For equipment makers, utilities and research institutes planning a high-power test lab or testing centre, the project is a working reference for the prefabricated buildings, with structure, HVAC, auxiliary power distribution and site assembly from one manufacturer.

Air-core reactors marked 100 mH and 200 mH beside a long test lab E-House with double doors and louvres

Project Facts

Current source‎15.4 × 11 × 6.3 m (L × W × H)
Voltage source‎15 × 13 × 4.5 m (L × W × H)
Power supply‎11 × 4 × 3.2 m (L × W × H)
Control room‎10 × 5 × 3 m (L × W × H)
Test cell‎10 × 10 × 7 m (L × W × H)
DeliveryOctober 2026

Project Images

Two large test lab E-Houses facing each other, a smaller one between them and equipment crates in the yard
Two large test lab E-Houses facing each other, a smaller one between them and equipment crates in the yard
Open side door of a long test lab E-House beside air-core reactors marked 423 μH and 210 μH and tubular busbars
Open side door of a long test lab E-House beside air-core reactors marked 423 μH and 210 μH and tubular busbars
Air-core reactor yard and a test lab E-House with double doors and louvres on its long side
Air-core reactor yard and a test lab E-House with double doors and louvres on its long side
End of a test lab E-House with double doors, a second door open, an industrial air conditioner and an outdoor AC unit
End of a test lab E-House with double doors, a second door open, an industrial air conditioner and an outdoor AC unit

Related Application Solutions

Prefabricated Infrastructure

Prefabricated E-⁠House Project Delivery Solution

ETENZ delivers configurable prefabricated E-⁠House projects for electrical equipment integration, covering enclosure manufacturing, layout, wiring paths, factory checks, interface coordination, and OEM/ODM cooperation.

Related Products

ETENZ products related to the manufacturing, integration, or delivery scope of this project

Have a project in mind?

Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.