Ninghai 35 kV Substation E-House: Two Storeys, Eight Modules
Scroll down to learn more
Project Overview
ETENZ manufactured the two-storey E-House for a 35 kV prefabricated substation at Shepantu in Ninghai County, Zhejiang, China, and supplied it to Sieyuan Electric, the project's EPC contractor. Eight modules make up the building: the five on the lower level form the 35 kV and 10 kV switchgear rooms, and the three on the upper level hold the protection and control room and the 10 kV capacitor bank room. The lower level measures 12 × 7.5 m, the 9 × 7.5 m upper level stands on top of it, each level is 3.6 m high, and the equipment rooms add up to 157.5 m². The substation belongs to the Ninghai County Shepantu 35 kV power supply line project. ETENZ painted the E-House in Sieyuan Electric's livery and delivered it to site in October 2026. The modules have been joined on site, and equipment commissioning is now under way.

Service Scope
Two-Storey E-House Manufacturing and Auxiliary Systems (OEM for Sieyuan Electric)
ETENZ designed, manufactured and joined on site all eight modules, and fitted them out with the lighting, power and maintenance distribution and the earthing system; wall-mounted industrial air conditioners, axial exhaust fans and motorized intake dampers; insulating rubber mats along the inspection aisles of the switchgear rooms and ceramic anti-static flooring on the upper level; and two access stairs, a caged ladder and the guardrails of the upper-level walkway. ETENZ also painted the building in Sieyuan Electric's livery. The 35 kV and 10 kV switchgear, secondary panels and capacitor cabinets are Sieyuan Electric's equipment, and ETENZ worked with Sieyuan on installing them in the modules.

Engineering & Integration
Switchgear Below, Control and Capacitors Above
The 35 kV and 10 kV switchgear is heavy and carries many incoming and outgoing cables, so it occupies the five lower modules; the protection and control room and the 10 kV capacitor bank room take the three upper modules. The lower level includes a cable shaft, and the cable openings and spare panel positions between the levels are closed with cover plates before the modules leave the factory, to be opened on site as needed.
Eight Factory-Built Modules, Stacked Into Two Levels on Site
Each of the eight modules was built separately in the factory. On site, the lower level was joined first and the upper level was then stacked on top, with every module seam waterproofed. The frames are welded integral structures of steel sections; the roof, outer walls and doors are 2.0 mm steel plate, and the interior floor plate is 3 mm.
Access Stairs, Upper Walkway and Roof Ladder
The two access stairs are built at a 45° pitch with step spacing of 200 to 255 mm. The upper-level walkway is laid with WPC decking behind 1.2 m guardrails, the upper level has doors that open both ways, and a caged ladder on the upper roof gives maintenance access.
Insulated Walls and Indoor Climate Control
The 150 mm walls combine a rock wool fill with a polyurethane foam layer, and the roof is insulated as well, so the building is insulated on five sides. The two switchgear rooms and the protection and control room share five wall-mounted industrial air conditioners together with axial exhaust fans; in the 35 kV switchgear room, the motorized intake dampers open and close in step with the exhaust fans.

Delivery Outcome
The two-storey E-House reached site in October 2026 and its modules have been joined. The switchgear, secondary panels and capacitor cabinets are in place inside, and commissioning is under way on site. ETENZ delivered the complete building on an OEM basis in Sieyuan Electric's livery.
Project Value
Stacking two levels puts 157.5 m² of equipment rooms on a 90 m² footprint, which suits substations and switching stations where land is scarce. ETENZ builds the enclosure to the EPC contractor's technical agreement and brand identity and fits out the auxiliary systems inside, offering OEM delivery to grid EPC contractors and switchgear manufacturers.





Project Facts
| Enclosure protection | IP55 |
|---|---|
| Ambient temperature | -8.5 to 39.5 °C |
| Maximum wind speed | 35 m/s |
| Ice thickness | 30 mm |
| Seismic intensity | 8 (0.3 g) |
| Delivery | October 2026 |
Project Images







Related Application Solutions
Prefabricated E-House Project Delivery Solution
ETENZ delivers configurable prefabricated E-House projects for electrical equipment integration, covering enclosure manufacturing, layout, wiring paths, factory checks, interface coordination, and OEM/ODM cooperation.
Related Products
ETENZ products related to the manufacturing, integration, or delivery scope of this project
Related News
Have a project in mind?
Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.