Aerial view of Richborough Energy Park: rows of battery and PCS containers with the project livery on their roofs

UK BESS PCS Containers: 20 Units for Richborough Energy Park

Richborough Energy Park, Kent, UK (100 MW / 100 MWh)Europe
Richborough UK
‎100 MW BESS
20 PCS units
‎18×40 ft + 2×20 ft
NR Electric
July 2022 delivery

Scroll down to learn more

Project Overview

Renewables & StorageJul 2022Europe

ETENZ manufactured 20 PCS containers for NR Electric for Richborough Energy Park in Kent, UK, a 100 MW / 100 MWh battery energy storage system connected to the transmission grid through National Grid's 400 kV Richborough substation. Eighteen 40 ft high cube units each house a 5.5 MW power conversion and step-up set, and two 20 ft high cube units house 2.75 MW each. The containers were delivered in July 2022 and reached site in October 2022. ETENZ built the enclosures and fitted the auxiliary systems before shipment: UK-standard sockets, LED lighting with 90-⁠minute emergency lighting, smoke detectors, exit signs, heaters, and temperature and humidity controllers with an English interface. The containers left the factory in the project's livery. Richborough Energy Park was connected to the grid in December 2023 and is in commercial operation.

40 ft PCS container: green lightning panel, project brand marks and the transformer compartment mesh doors

Service Scope

Enclosure Manufacturing and Auxiliary System Fit-Out

ETENZ manufactured the PCS containers in two high cube sizes, 40 ft and 20 ft, to NR Electric's technical requirements, including the enclosure structure, the mesh ventilation doors of the transformer compartment, and the door locks and seals. Inside, ETENZ fitted UK-standard sockets, CE-marked LED lighting, 90-⁠minute emergency lighting, smoke detection, exit signs, heaters, and temperature and humidity controllers with an English interface, and painted the exterior in the project's livery. NR Electric supplied the power conversion equipment and transformers.

PCS container with doors open: walk-through aisle at left, transformer compartment and open mesh doors at right

Engineering & Integration

Two Lengths, One Cross-Section

Units with a 5.5 MW power conversion and step-up set use a 40 ft high cube (12,192 mm long); the 2.75 MW units use a 20 ft high cube (6,058 mm). Both sizes share the same 2,438 mm width and 2,896 mm height and carry standard corner castings and container numbers.

Mesh Doors on the Transformer Compartment

On each 40 ft unit, four mesh doors in the middle of the long side face the transformer compartment. They ventilate it and open fully for maintenance access.

Auxiliary Systems Fitted for a UK Site

UK-standard sockets, CE-marked LED lighting, 90-⁠minute emergency lighting, smoke detectors, exit signs, heaters and English-interface temperature and humidity controllers were installed at the factory, ready for the site team on arrival.

Project Livery Applied at the Factory

The green lightning panel and the project and equipment brand marks were painted at the ETENZ factory, so every container arrived on site in the project's livery.

Transformer compartment with the mesh doors fully open, showing the transformer radiators

Delivery Outcome

The 20 PCS containers were delivered to NR Electric in July 2022 and reached the UK site in October 2022. Richborough Energy Park was connected to the grid in December 2023 and is now in commercial operation.

20
PCS containers
‎18 × 40 ft and 2 × 20 ft high cube units
5.5 MW
Per 40 ft unit
Power conversion and step-up set housed in each 40 ft unit; 2.75 MW in each 20 ft unit
100 MW
Station served
‎100 MWh battery storage connected through a 400 kV substation

Project Value

The project puts ETENZ enclosures into transmission-connected battery storage in the UK: two sizes, 20 units in one batch, auxiliary systems fitted for the UK site and the project's livery applied at the factory. PCS and transformer manufacturers and BESS integrators can hand ETENZ the enclosure manufacturing and auxiliary fit-out and have it built around their own equipment and brand.

Close-up of the aerial view: rows of containers on the gravel yard at Richborough Energy Park

Project Facts

LocationKent, UK
Station rating‎100 MW / 100 MWh
Grid connectionNational Grid 400 kV Richborough substation
‎40 ft high cube‎12,192 × 2,438 × 2,896 mm, 18 units
‎20 ft high cube‎6,058 × 2,438 × 2,896 mm, 2 units
DeliveryJuly 2022

Project Images

Long side of a 40 ft PCS container: four mesh doors to the transformer compartment, solid doors to the right
Long side of a 40 ft PCS container: four mesh doors to the transformer compartment, solid doors to the right
End doors of a PCS container with the container number, gross and tare weight markings and high cube label
End doors of a PCS container with the container number, gross and tare weight markings and high cube label
Top of the transformer compartment: transformer radiators, junction box and flexible metal conduits
Top of the transformer compartment: transformer radiators, junction box and flexible metal conduits

Related Application Solutions

Energy Storage & Renewables

BESS Enclosure Manufacturing and Integration

BESS enclosure manufacturer for battery makers and integrators: series-built to your drawings, or battery-ready around your pack with racks, liquid cooling, fire protection and wiring, factory-tested. OEM/ODM available.

Related Products

ETENZ products related to the manufacturing, integration, or delivery scope of this project

Have a project in mind?

Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.