Project Overview

Renewables & StorageOct 2026China & East Asia

ETENZ built 24 containers for Sieyuan Electric's grid-forming battery energy storage system (BESS) at the 500 kV collector substation in Abag Banner, Xilingol League, Inner Mongolia. Each container measures 5,650 × 2,438 × 3,288 mm (L × W × H) and is divided into a PCS compartment, battery compartments and a valve compartment at one end. ETENZ supplied the enclosure, the battery racks and the internal power distribution; Sieyuan Electric supplied the batteries, the PCS and the other system equipment and integrated the system. The containers were delivered in October 2026, and site commissioning has been completed. The substation exports power from a 1,400 MW wind project. Grid-forming storage actively supports grid voltage and frequency and, together with the synchronous condensers at the same substation, strengthens the system that carries large-scale wind power to the grid. The condenser buildings and electrical E-⁠Houses at the substation were also built by ETENZ.

Several rows of grid-forming BESS units on their foundations at the substation, wind turbines in the distance

Service Scope

Container enclosures, battery racks and power distribution for Sieyuan Electric

Working to Sieyuan Electric's system layout, ETENZ manufactured the storage containers: the steel base frame, structure and cladding; the PCS compartment, battery compartments and end valve compartment with their doors; the battery racks in the battery compartments; the internal power distribution; and the paint finish and customer branding. Sieyuan Electric supplied the batteries, PCS and other system equipment and integrated the system.

BESS container front: PCS compartment door, two pairs of battery compartment doors and the end valve compartment

Engineering & Integration

Three types of compartment in one 5,650 mm container

Within a length of 5,650 mm, each container is divided into a PCS compartment, battery compartments and a valve compartment at the end. Every compartment has its own doors with Chinese and English labels, and the PCS equipment and the batteries sit in separate compartments.

Non-walk-in battery compartments with full-length side doors

ETENZ designs and builds the battery racks, with arms reaching from the back wall towards the doors. Each battery compartment opens along the long side through two pairs of double doors: battery packs are pushed in from the doorway and serviced from outside, so no aisle takes up depth inside the container.

Sized to the storage system layout

The containers are 2,438 mm wide and 3,288 mm high. Their outer dimensions, compartments and internal power distribution follow Sieyuan Electric's layout of battery racks, PCS and piping, and they leave the factory with the customer's branding, ready to be set on their foundations at site.

More than 600 of the same model for Sieyuan Electric

ETENZ builds this container model in volume for Sieyuan Electric. More than 600 had been delivered by November 2026, and the 24 units for Abag Banner are one batch of them.

BESS container on its concrete foundation, with battery compartment doors on the long side and a louvred end bay

Delivery Outcome

The 24 containers were delivered in October 2026, and site commissioning at the Abag Banner 500 kV collector substation has been completed. The condenser buildings and electrical E-⁠Houses at the same substation were also built by ETENZ and stand in place.

24
Containers
Built for Sieyuan Electric's grid-forming BESS and delivered in October 2026
600 +
Same model delivered
Containers of this model delivered to Sieyuan Electric by November 2026
3.29 m
Container height
‎5,650 mm long, 2,438 mm wide, 3,288 mm high

Project Value

This container model puts the PCS compartment and the battery compartments in one enclosure, so its size, compartments, doors and piping interfaces have to follow the storage system maker's equipment layout. ETENZ builds the model in volume to Sieyuan Electric's layout, with more than 600 delivered by November 2026. Storage system makers and integrators can hand ETENZ the enclosure, battery racks and internal power distribution of their containers, built to their own layout and branding.

ETENZ electrical E-House at the same substation, with double doors, wall-mounted air conditioners and louvers

Project Images

Front of a Sieyuan grid-forming BESS unit: storage containers at both ends, a transformer unit in the middle
Front of a Sieyuan grid-forming BESS unit: storage containers at both ends, a transformer unit in the middle
Container doors for the PCS compartment, battery compartments and branch pipe valves, with cable trench covers in front
Container doors for the PCS compartment, battery compartments and branch pipe valves, with cable trench covers in front

Related Application Solutions

Energy Storage & Renewables

BESS Enclosure Manufacturing and Integration

BESS enclosure manufacturer for battery makers and integrators: series-built to your drawings, or battery-ready around your pack with racks, liquid cooling, fire protection and wiring, factory-tested. OEM/ODM available.

Related Products

ETENZ products related to the manufacturing, integration, or delivery scope of this project

Have a project in mind?

Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.