Minami-Hayakita battery storage seen from a transmission tower: rows of flow battery units and PCS containers

Japan BESS PCS Containers: 18 Units for Minami-Hayakita, Hokkaido

Minami-Hayakita Substation battery storage, Hokkaido, Japan (17 MW / 51 MWh)China & East Asia
Hokkaido Japan
‎17 MW / 51 MWh
18 PCS units
‎30 ft · 1 MW each
NR Electric
May–July 2021

Scroll down to learn more

Project Overview

Renewables & StorageJul 2021China & East Asia

ETENZ manufactured 18 PCS containers for NR Electric for the grid-side battery storage system at Hokkaido Electric Power Network's Minami-Hayakita Substation in Abira, Hokkaido, Japan. The 17 MW / 51 MWh redox flow battery, supplied by Sumitomo Electric as EPC contractor, smooths the output fluctuations that wind power brings to Hokkaido's grid and has been in operation since April 2022. All 18 containers are 30 ft high cube units (9,125 × 2,438 × 2,896 mm), each housing a 1 MW power conversion and step-up set: the PCS, step-up transformer and MV equipment. They were delivered to NR Electric in batches between May and July 2021. ETENZ built the enclosures. Each unit is divided into two PCS compartments, a transformer compartment and an MV compartment. For Hokkaido's snow and cold, the intake and exhaust openings carry SUS304 stainless steel snow hoods, the intake louvers are filtered, and the transformer compartment has its own service door. NR Electric supplied the equipment inside.

Minami-Hayakita battery storage in winter snow, with forest behind

Service Scope

Enclosure Manufacturing with Snow-Proof Ventilation

ETENZ manufactured eighteen 30 ft high cube PCS containers to NR Electric's technical requirements, including the enclosure structure and compartments (two PCS compartments, a transformer compartment and an MV compartment), intake and exhaust louvers with intake filtration, SUS304 stainless steel snow hoods, a service door to the transformer compartment with an inner stainless steel mesh door, stainless steel lifting lugs and cable cleats. NR Electric supplied the PCS, step-up transformers and MV equipment.

Row of PCS containers along the site aisle, with snow hoods on their sides

Engineering & Integration

Four Compartments for 1 MW

Inside a 30 ft high cube (9,125 mm long), the enclosure is divided into two PCS compartments, a transformer compartment and an MV compartment, so one container takes a complete 1 MW power conversion and step-up set.

Stainless Steel Snow Hoods on the Vents

Hokkaido winters bring heavy snow and low temperatures. SUS304 stainless steel snow hoods over the intake and exhaust openings keep falling and wind-blown snow from blocking them, and the filters behind the intake louvers sit on brackets inside the enclosure.

Separate Access to the Transformer

The transformer compartment has its own service door with a stainless steel mesh door behind it, so the transformer can be serviced without passing through the PCS compartments.

18 Units Delivered in Batches

The first 8 units were delivered to NR Electric in May 2021, and the remaining 10 followed by July 2021.

The site in winter: PCS containers with snow hoods over their vents

Delivery Outcome

The 18 PCS containers were delivered to NR Electric between May and July 2021. The Minami-Hayakita battery storage system went into operation in April 2022.

18
PCS containers
‎30 ft high cube units with four compartments each
1 MW
Per container
PCS, step-up transformer and MV equipment in each unit
51 MWh
Station served
‎17 MW redox flow battery, in operation since April 2022

Project Value

The project puts ETENZ PCS containers into grid-side battery storage owned by a Japanese transmission and distribution utility: four compartments for a 1 MW set in one 30 ft unit, stainless steel snow hoods and filtered intakes for Hokkaido's winter, and 18 units delivered in batches. PCS and transformer manufacturers and BESS integrators working on projects in Japan or other cold regions can hand ETENZ the enclosure manufacturing and have it built around their own equipment layout and the local climate.

Close-up of the aerial view: flow battery units and PCS containers in rows on the gravel yard

Project Facts

LocationAbira, Hokkaido, Japan
Station rating‎17 MW / 51 MWh
Storage typeGrid-side redox flow battery
SubstationMinami-Hayakita Substation, Hokkaido Electric Power Network
EPC and batteriesSumitomo Electric
‎30 ft high cube‎9,125 × 2,438 × 2,896 mm, 18 units
DeliveryMay–July 2021

Project Images

The aisle inside the site gate, lined with PCS containers and flow battery units
The aisle inside the site gate, lined with PCS containers and flow battery units
Minami-Hayakita battery storage in spring, seen from outside the site with forest around it
Minami-Hayakita battery storage in spring, seen from outside the site with forest around it

Related Application Solutions

Energy Storage & Renewables

BESS Enclosure Manufacturing and Integration

BESS enclosure manufacturer for battery makers and integrators: series-built to your drawings, or battery-ready around your pack with racks, liquid cooling, fire protection and wiring, factory-tested. OEM/ODM available.

Related Products

ETENZ products related to the manufacturing, integration, or delivery scope of this project