Project Overview
ETENZ built four prefabricated enclosures for NR Electric's 2 × 50 Mvar synchronous condenser project at a 500 kV collector substation in Abag Banner, Inner Mongolia: two synchronous condenser buildings measuring 45.2 × 12.4 × 9 m, each housing one 50 Mvar condenser with its lube oil and water cooling units, and two electrical E-Houses measuring 44.2 × 9.2 × 3.75 m for the condensers' switchgear and control panels. ETENZ manufactured the structures and fitted the auxiliary systems: air conditioning, ventilation, lighting and power distribution. The collector substation exports power from a 1,400 MW wind project in Xilingol League, and the condensers give the export system dynamic reactive power and short-circuit strength. All four enclosures are in place on site, and equipment installation is under way.

Service Scope
Condenser buildings and electrical E-Houses with auxiliary systems, built for NR Electric
Working from the design institute's interface drawings and NR Electric's equipment layout, ETENZ manufactured the four enclosures and fitted their auxiliary systems: the Q355 square-tube frame and cladding of the condenser buildings and the welded base frames and bodies of the electrical E-Houses; wall-mounted industrial air conditioners, filter fans and intake louvers; floodlights, general lighting and battery-backed emergency and exit lighting; power and maintenance distribution and earthing; fire extinguisher cabinets, stainless steel panic exit locks and rodent guards at the door openings; ceramic anti-static flooring and numbered insulating mats in the electrical E-Houses; and lifting slings and shackles shipped with the enclosures. NR Electric and the equipment makers supplied the condensers, excitation and control equipment.

Engineering & Integration
Condenser buildings 12.4 m wide and 9 m high
Each 45.2 × 12.4 × 9 m building houses a condenser and its lube oil and water cooling units. The main frame is Q355 square tube, laser-cut, blast-cleaned and welded. Each building has a 2.59 × 2.66 m double door and several single doors, all fitted with stainless steel panic exit locks.
14 industrial air conditioners per condenser building, 16 per E-House
Each condenser building carries 14 externally mounted industrial air conditioners and 14 filter fans. Each electrical E-House has 16 wall-mounted industrial air conditioners and 12 filter fans, with G4 filter media behind the intake louvers to keep grassland dust out.
Anti-static flooring and numbered insulating mats in the E-Houses
The electrical E-Houses have 600 × 600 mm ceramic anti-static floor tiles. The 35 kV and 10 kV insulating mats are cut to 15 sizes for their positions and numbered on the packaging, so the site crew lays them by number. Rodent guards at the door openings are deburred and their side channels guarded, and the emergency and exit lights carry built-in batteries rated for at least 2 hours.

Delivery Outcome
All four enclosures have arrived at the Abag Banner 500 kV collector substation and stand on their foundations, with equipment installation under way. ETENZ delivered the enclosures and their auxiliary systems to NR Electric's equipment layout.
Project Value
Manufactured as prefabricated enclosures and set on their foundations at site, the condenser buildings and electrical E-Houses let enclosure production run in parallel with the substation's civil works. ETENZ builds condenser buildings and electrical E-Houses to the equipment supplier's layout and the design institute's interface drawings, for synchronous condenser projects at renewable collector substations and wind power export schemes. Since 2023, ETENZ has supplied prefabricated enclosures for more than 20 of NR Electric's synchronous condenser projects.





Project Images





Related Application Solutions
Synchronous Condenser Electrical E-House Integration Solution
An integrated primary and secondary electrical E-House solution for synchronous condenser projects, translating drawings, equipment layout, interfaces, HVAC, fire safety, security and site assembly requirements into factory-built delivery units.
Related Products
ETENZ products related to the manufacturing, integration, or delivery scope of this project
Related News
Have a project in mind?
Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.