China Southern Power Grid Liping 500 kV Substation: Twin-Module DC De-icing Control E-House
Scroll down to learn more
Project Overview
ETENZ manufactured one DC de-icing control building for NR Electric at China Southern Power Grid's (CSG) Liping 500 kV substation in Guizhou, China. The E-House comprises two modules and measures 11.4 × 5.6 × 3.5 m overall when assembled. ETENZ's scope covered the enclosure, wall-mounted air conditioners, fire protection and interior integration. The E-House has been delivered to the station and placed on its concrete foundation. Liping is in Qiandongnan, on the Guizhou–Guangxi border, one of the areas most affected by icing in CSG's five southern provinces and regions. The E-House supports the second fixed DC de-icing system being added to the station in 2026. Its two modules were manufactured and transported separately, then joined side by side at Liping, where a cable trench runs alongside the foundation.

Service Scope
Twin-Module Control E-House Manufacturing and Interior Integration for NR Electric
ETENZ manufactured and joined the two modules, supplied and installed the wall-mounted air conditioners and the fire protection system, and completed the interior integration to NR Electric's panel layout. The E-House was delivered to NR Electric and went into the Liping substation with the de-icing system.

Engineering & Integration
Two Modules Form One E-House
The two modules were manufactured and transported separately, then joined side by side at Liping to form one continuous equipment room. The assembled E-House measures 11.4 × 5.6 × 3.5 m overall.
Interior Systems Completed With the Enclosure
The openings and mounting positions for the air conditioners, the fire protection system and the interior integration were set out while the enclosure was being fabricated, and ETENZ completed all three together with the enclosure.
End-Wall Air Conditioners and External Drainage
The air-conditioning units are mounted on the outside of the end walls, and external downpipes on the long walls carry roof rainwater to the ground. On the long wall, a single door serves personnel access and a double door serves equipment.

Delivery Outcome
The E-House has reached CSG's 500 kV Liping substation and stands on its concrete foundation. ETENZ delivered the complete E-House to NR Electric as its manufacturing partner.
Project Value
This project combines separate module fabrication and transport with on-site assembly into a control E-House 5.6 m wide. Air conditioning, fire protection and interior integration form part of the enclosure delivery. Wide control E-Houses for other de-icing stations and substations can use a module arrangement and delivery scope tailored to the required equipment layout.





Project Images

Related Application Solutions
Prefabricated E-House Project Delivery Solution
ETENZ delivers configurable prefabricated E-House projects for electrical equipment integration, covering enclosure manufacturing, layout, wiring paths, factory checks, interface coordination, and OEM/ODM cooperation.
Related Products
ETENZ products related to the manufacturing, integration, or delivery scope of this project
Have a project in mind?
Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.