Zhongshan AI Data Center E-House: Jereh's 2 MW Pilot Project
Scroll down to learn more
Project Overview
ETENZ manufactured and integrated three AI data center power E-Houses for Jereh's 2 MW pilot project and test center in Zhongshan, Guangdong, China. Known on the project as power unit modules, the E-Houses hold 10 kV medium-voltage switchgear, solid-state transformer (SST) and transformer cabinets, low-voltage switchboards and battery cabinets. Cubicle foundations, overhead cable routing, lighting and fire protection interfaces were completed at the factory. The pilot project is the validation platform for Jereh's AI data center system integration solution.

Service Scope
AI Data Center Power E-House Manufacturing and Interior Integration
ETENZ developed the detailed structural design, manufactured the E-House enclosures and completed the interior integration at its factory: mounting foundations for the cubicle lineups; overhead cable ladders, busway hangers and the main grounding conductor; floor cable entries; normal and emergency lighting; and the wiring and interfaces for fire detection and alarm, gas suppression release interlocks, and access control and video surveillance. ETENZ also designed and built the auxiliary distribution and control assemblies inside the E-Houses. The MV switchgear, solid-state transformer, LV switchboards and battery cabinets are customer-specified equipment, positioned inside the E-Houses according to the equipment list.

Engineering & Integration
Two Units Joined into One Wide E-House
Two of the E-Houses each have one long side left open. On site they were brought together and joined into a single wide E-House: the cubicle lineups stand on either side facing each other across a continuous operating and maintenance aisle, the seam runs along the aisle centerline, and floor cover plates and a roof closure finish the joint. Equipment is loaded unit by unit at the factory and shipping is still sized per unit, so the interior width is no longer limited by single-unit transport dimensions.
From 10 kV Incoming Line to LV Feeders
Equipment inside the E-Houses is lined up in the order power flows: the 10 kV MV switchgear connects the utility and energy storage circuits, the SST and transformer section steps the voltage down, and the LV switchboards feed downstream loads, with battery cabinets alongside and DC power cabinets supplying operating power to the switchgear. Cubicle positions, cable entry and exit openings and the connections between units were all laid out along this chain.
Lineup Foundations Matched to Equipment Data
During detailed design, each cubicle position was set from the outline dimensions and weight of the MV switchgear, transformer, SST, LV switchboards and battery cabinets: the channel-steel floor foundations are cut and drilled to each cubicle type, an operating aisle is kept in front of the lineup, and cable openings line up with the top and bottom termination points of the cubicles. The MV switchgear, transformer and LV switchboards were set in place inside the E-Houses at the ETENZ factory.
Tiered Overhead Routing and Grounding
Heavy power cables run on cable ladders above the lineups and enter the cubicles from the top, control wiring takes a separate wireway, and a green-and-yellow grounding conductor runs the full length with the ladders. Light fixtures and smoke detectors sit between the ladders, so cables can be serviced without removing any lights first.
Fire and Security Interfaces Built In
Smoke detectors are laid out by zone inside the E-Houses, and the horn-strobes, emergency lighting and exit signs were wired at the factory, along with the gas suppression release interfaces and the access control and video wiring. The fire alarm and gas suppression control panels and a discharge indicator sit outside the doors, leaving only the system tie-in for the site.

Delivery Outcome
As of October 2026, the E-Houses have been delivered to Zhongshan as complete units and stand side by side inside the pilot project's building, making up the power supply portion of this AI data center system integration validation platform.
Project Value
This division of work, in which the customer sets the power architecture and main equipment while ETENZ builds the E-Houses and integrates their interiors, suits solution providers and equipment makers packaging AI data center power into standard E-House products.





Project Images




Related Application Solutions
Data Center Power E-House Solution
A factory-built power E-House solution for data center operators, OEMs and system integrators that need MV/LV power rooms with coordinated HVAC, monitoring, fire-safety, security and site handover interfaces.
Related Products
ETENZ products related to the manufacturing, integration, or delivery scope of this project
Related News
Have a project in mind?
Message us on WhatsApp or send an inquiry. We reply within 24 hours on working days.