Custom Equipment Container Specification: What to Define for an Enclosure-Only Order
E
ETENZ•Editorial Team
A custom equipment container specification for an enclosure-only order settles the outline and CSC approval, the wall, roof and floor build-up and insulation, doors, hatches and openings, ventilation, IP rating, corrosion protection, lifting and forklift handling, documents and how the container is quoted. This guide takes each item in the order of a specification and ends with what to send for a quotation.
Most of a custom equipment container specification is fixed before the first drawing. The equipment's size, weight and heat set the layout and openings, the site sets insulation and corrosion protection, and the shipping route sets the outline and whether the container needs a CSC plate. On an enclosure-only order, where you fit the equipment yourself, these are also the lines that make quotes from different suppliers comparable.
ETENZ, a manufacturer based in Shanghai, China, builds custom equipment containers for projects worldwide to the buyer's drawing or reference design, including enclosure-only orders: the steel container with its base frame, walls, roof, floor and insulation, doors and hatches, wall and roof openings, gland plates, louvers, lifting points and coating, ready for your process or electrical equipment. To date, ETENZ products have been sold in more than 20 countries and regions across Asia, Europe, Africa, North America and South America, and delivered to over 3,000 projects. The same container can also leave the factory with power distribution, HVAC, fire protection and monitoring installed; each supply scope is on the custom equipment containers page. The sections below follow the order of a specification.
What an enclosure-only order includes
Item
Built by ETENZ in the factory
Installed by you, or added to the scope
Structure and insulation
Steel frame, base frame and corner castings; wall, roof and floor panels with insulation and inner lining; end doors, side doors and hatches
—
Openings and interfaces
Wall and roof openings with framing, reinforcement and covers; cable entry gland plates; louvers; brackets for AC outdoor units and equipment fixing points
Installing and connecting equipment, piping and cables after delivery
Coating and marking
Coating system to the corrosion category; your color, nameplates and brand marks
—
Transport
Lifting points; forklift pockets on 10 and 20 ft units; CSC plate on ISO-outline containers
Shipping method and booking
Equipment inside
—
Process and electrical equipment supplied by you; AC units, fans, lighting, power distribution and fire protection supplied by you, or included in the scope and installed before shipment
Openings, brackets and fixing points are made to your equipment data; installing, connecting and commissioning the equipment after delivery is done by you or the equipment maker.
Outline, standards and CSC approval
The outline takes one of two routes: a 10, 20 or 40 ft high-cube outline to ISO 668 with corner castings to ISO 1161, or a non-standard size, such as an empty 4,000 × 2,500 × 2,500 mm steel enclosure. The route decides how the unit ships, and approval and lifting follow from it.
When a CSC plate pays off
A CSC Safety Approval Plate, under the International Convention for Safe Containers, lets the unit be booked and stacked like any other container and, with an owner code, shipped as a shipper-owned container (SOC). That needs length, width and height within ISO dimensions, corner castings in the standard positions and nothing protruding in transport, so door-mounted air conditioners come off. A unit outside ISO dimensions does not fit ship cell guides, so CSC saves nothing on freight; it ships on a flat rack or as breakbulk, with a lifting design and lashing plan.
What changes an approved design
CSC approval is issued per design and covers every container built to it. A new door, an opening or a different wall panel changes the approved design, and the approval body decides between a supplementary approval and a new prototype test. Fix opening positions before the design goes for approval: moving one afterwards goes back to the approval body.
The ETENZ 20 ft high-cube design holds a RINA CSC type approval for a maximum gross mass of 50,000 kg; a 40 ft design needs its own approval. CSC costs come in three parts, the one-off design approval and prototype test, the survey and certification of each batch, and the plate on each container, and each appears as its own line in the quotation. A container that keeps an approved design unchanged skips the new design approval.
The ETENZ 20 ft high-cube design holds RINA CSC type approval for a maximum gross mass of 50,000 kg; the container number and weights are marked on the doors.
With the covers closed, nothing on the roof rises above the top of the corner fittings, so the container still lifts with a standard spreader and stacks like any other.
Walls, roof, floor and insulation
The standard build is 1.6 to 2.0 mm corrugated steel walls, a 2.0 mm galvanized roof, a channel and square-tube frame and 50 mm rock wool, with a galvanized steel inner lining.
Where the specification asks for smooth outer walls without corrugation, 2.0 mm flat steel sheet with vertical tube stiffeners replaces the corrugated panel. Corrugation gives a standard container much of its wall stiffness; a smooth wall gets it back from the stiffeners, so a smooth-wall container type goes through CSC approval as a new design.
Rock wool is non-combustible; polyurethane is closed-cell and lighter. Thickness follows the site climate and the temperature to be held inside, from 50 mm upward. If the specification sets a U-value, say whether it includes the steel studs and crossmembers: they pass through the insulation, and a wall loses far more heat through them than the panel figure suggests.
The floor is a steel plate on crossmembers, with insulated floors closed underneath by a steel sheet. Give equipment loads as supports: operating weight, support positions and footprint for each item, and which weights are inside during lifting and transport and which arrive on site, such as tanks filled after installation. ETENZ designs the base frame and floor from those supports and operating weights.
Doors, hatches and openings
Door openings, louver openings, cable entries and large roof cut-outs all interrupt wall panels or roof beams, so each one is framed and reinforced and shown on the drawing.
A personnel door works as an escape door: lockable from outside, opened from inside without a key. The frame and seals take part of the opening, so state the clear width and height the equipment needs rather than a nominal door size.
Large roof openings, for DN800 flanges for example, get insulated, gasketed removable covers, and side hatches get gas struts and locks. Cables enter through bolted, gasketed removable gland plates placed to your cable schedule. Give the weight of each AC outdoor unit; its bracket and the wall reinforcement are sized from it.
Door louvers, wall-mounted air conditioners and the intake louver are all openings cut into the enclosure walls, each one framed.
Ventilation and heat
Natural ventilation runs through louvers with rain hoods and insect screens. Their free area is sized from the equipment's heat loss at the site design temperature. Free area, pressure loss and IP rating are one decision: a louver with a higher IP rating needs more area for the same airflow.
Natural ventilation only brings the inside close to the outside air temperature. For five 50 kW string inverters at 45 °C ambient, size the louvers from the inverters' losses and derating curve at that temperature; where the area does not fit, filter fans or air conditioning take over. A light-colored topcoat reduces solar gain.
IP rating and how it is verified
IP54 or IP55 to IEC 60529 is the usual specification, and IP56 can be built where specified. The weakest point sets the rating of the whole container: a door seal, a louver, a gland plate or an AC opening.
State the level of proof with it: component IP documents with factory inspection, or a water test on the finished container, witnessed by you or reported by a laboratory, arranged per project.
Corrosion protection and coating
Specify the ISO 12944 corrosion category, C3, C4 or C5, with the durability range: C5-H means 15 to 25 years to the first major maintenance. Interiors usually run one or two categories lower, such as C5 outside and C3 inside.
A category alone cannot be inspected, so write the coating system out: blast cleaning to Sa 2½, the product and dry film thickness of each coat, the total dry film thickness, and stripe coats on welds and cut edges. ETENZ quotes the coating system coat by coat in this form, and the inspection records shipped with the container include the measured film thickness.
The base frame is coated rather than galvanized, and the roof is galvanized sheet. Color follows your code, RAL 7016 for example, with nameplates and brand marks to your requirements. How coastal and chemical sites are handled is covered in making corrosion protection inspectable.
Base frame, lifting and forklift pockets
The base frame is welded channel steel, coated with the container. A container with an ISO outline lifts through its four top corner fittings with a container spreader; a non-standard enclosure lifts from the base frame, at four points on short units and eight above 12.2 m, with lugs on the transverse main beams. List the lifting drawing, center-of-gravity calculation and sling force analysis among the documents.
On 10 and 20 ft containers, forklift pockets follow ISO 1496-1. On 40 ft containers they fall outside that standard, so they are a project design and usually rated for the empty container. State what is inside during lifting and transport: equipment fitted or not, tanks empty or full.
Welding, steel certificates and structural calculation
Where the specification names AWS D1.1, structural welds follow it and welds on sheet below 3 mm follow AWS D1.3, with welding procedures and welders qualified before production and witnessed by a third party.
EN 10204 3.1 inspection certificates for the load-bearing steel are supplied on request.
The structural calculation is made to EN 1993 and delivered with the container, stating permissible loads for operation, lifting and transport. For US projects, a calculation to ASCE 7 and AISC 360 can be prepared for review and stamping by your engineer of record.
Documents and inspection before shipment
Each container ships with its general arrangement drawing, opening schedule, structural calculation, coating record and factory inspection records, with EN 10204 3.1 certificates on request and the CSC certificate and plate where the design is approved.
Before shipment you can inspect at the factory yourself or appoint an inspector such as BV or SGS. The structural design life is 25 years with maintenance, and the warranty is 12 months, extendable to 24 depending on the project.
Beyond the empty container
Beyond the enclosure itself, ETENZ installs power distribution, lighting, HVAC, fire protection and monitoring in the container and tests each system before shipment. The four supply scopes are Enclosure Only (Interface-Ready), Subsystem Integration, Factory-Integrated Module and OEM/ODM Under Your Brand. Diesel gensets and chillers have established layouts: see the genset enclosure and the chiller plant enclosure. For water treatment equipment, the options are set out in four delivery scopes for water treatment modules.
How enclosure-only containers are quoted
Enclosure-only containers are quoted per unit, not per square meter, with CSC design approval as a one-off line per design. Indicative prices are given EXW Shanghai and formal quotations FOB Shanghai; ocean freight and insurance from there are arranged by your forwarder. A first container can confirm the build and interfaces before a series follows on the same drawings and process; the first unit and the series are priced separately.
What to send with an RFQ
The more of this a request carries, the closer the first quotation comes to the final price:
Drawing or reference design, outline, quantity and destination.
Equipment list: outline, operating weight, support positions and heat loss of each item.
Transport: ISO outline or non-standard size, CSC or not, trade terms.
Build: corrugated or smooth walls, insulation material and thickness or U-value, inner lining and floor finish.
Doors, hatches, openings, gland plates and louvers: size, position, covers and locks.
Site: highest and lowest temperatures, corrosion category and durability, color.
IP rating and the level of proof.
Welding code, material certificates and calculation code.
With complete information, ETENZ prices the drawing and returns a formal quotation. You can also submit an RFQ directly.
Frequently asked questions
Can a modified container keep its CSC plate?
Yes, once the modified design is approved. A new door, an opening or a different wall panel changes the approved design, and the approval body decides between a supplementary approval and a new prototype test. Enclosures outside ISO dimensions ship on a flat rack or as breakbulk.
How do smooth-wall and corrugated equipment containers differ?
A smooth wall gives a flat face for signage and brackets. Structurally, a corrugated panel is stiff on its own, while a smooth wall relies on vertical stiffeners, uses somewhat more steel and needs its own CSC type approval.
Is an equipment container the same as an equipment shelter?
Largely, yes. North American makers often call a steel building for telecom, utility or process equipment an equipment shelter; built on a container outline, the same product is an equipment container. ETENZ builds it on 10, 20 or 40 ft outlines or in non-standard sizes.
Who installs the equipment?
On an enclosure-only order, you install the process and electrical equipment. AC units, fans, lighting, power distribution and fire protection can come from you, or be included in the scope and installed and tested at the factory before shipment.
Can you supply projects outside China, and how do the containers ship?
Yes. ETENZ products go to projects in more than 20 countries and regions across five continents. ISO-outline containers with a CSC plate ship as standard containers; other sizes go on a flat rack or as breakbulk, with a lifting design and lashing plan. Quotations go up to FOB Shanghai, and your forwarder arranges the ocean freight from there.